Show simple item record

Assembly of the Biogas plant

dc.contributor.authorSpoken Tutorial and Rural ICT Project
dc.contributor.authorIIT Bombay
dc.date.accessioned2018-10-19T23:54:18Z
dc.date.available2018-10-19T23:54:18Z
dc.date.issued2015-12-28
dc.identifier.urihttp://doer.col.org/handle/123456789/8312
dc.description.abstractOutline: How to assemble the Digester tank with the dome, Mixing tank and Slurry tank. Placing the dome on the raised wall of the digester tank. Plastering of the dome. Attaching of the walls of the slurry tank with the dome. Connecting mixing tank to the digester tank via the Inlet pipe. Pre-requisite: Building the walls of the Slurry tanken_US
dc.language.isoenen_US
dc.publisherSpoken Tutorial IIT Bombayen_US
dc.relation.ispartofseriesNational Mission on Education through ICT;
dc.relation.ispartofseriesTalk to a Teacher Project;
dc.source.urihttps://spoken-tutorial.org/watch/Biogas%2BPlant/Assembly%2Bof%2Bthe%2BBiogas%2Bplant/English/en_US
dc.titleAssembly of the Biogas planten_US
dc.typeVideoen_US


Files in this item

FilesSizeFormatView

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record